• Home
  • About Us
  • Services
      • Back
      • for DOT Primes
      • for DOTs
      • for Court Systems
      • for SMBS
      • for Publishers
  • Solutions
  • Projects
      • Back
      • Technology
      • Engineering
  • Blogs

Physical Needs Assessment of Housing Authority of Baltimore City (HABC) Apartments

Housing Authority of Baltimore City (HABC)

Physical Needs Assessment of Housing Authority of Baltimore City (HABC) Apartments

 Task Order: Housing Inspection & Data Entry

 

 

Concrete/Bridge Maintenance Repairs

Department Of Public Works / Engineering Division - Arlington County

Concrete/Bridge Maintenance Repairs & CMIS Data entry (Project Number:     013.319/TC80)

Task: CMIS

Task: Arlington County Bridge Master Plan (Arlington County Stormwater - Funding Feasibility Study)

Task: Load Ratings for Bridge 5014 (SBL N. Sycamore Street over Four Mile Run) and Bridge 5015 (MBL N. Sycamore Street over Four Mile Run)

Task: Removal and Replacement of East/West Pedestrian Bridge at Barcroft Park: Providing general bridge structure repair and maintenance, and related work on an as-needed basis for up to a three-year period.

Task: Removal and Replacement of West Pedestrian Bridge at Barcroft Park

 

Rehabilitation Alternatives for Shirlington Road Bridge

Department Of Public Works / Engineering Division - Arlington County

Task: Rehabilitation Alternatives, Shirlington Road Bridge over Four Mile Run, Str. No. 8900)

Structural Work at Dominion Vault

Department Of Public Works / Engineering Division - Arlington County

Task: Structural Work at Dominion Vault: 9th Street North – N. Stuart St. to N. Stafford St. Phase Two Ballston Project

The WalkArlington program has undertaken a pilot project in the Ballston area of Arlington County to encourage more people to walk more often to get about the County. The project calls for the construction of a traffic nub at the intersection of North Stuart Street and 9th Street North that will calm vehicular traffic and considerably enhance the sidewalk area available to pedestrians in the vicinity for walking.

Renovation of Steel Pedestrian Bridge

Department Of Public Works / Engineering Division - Arlington County

Task: Renovation of Steel Pedestrian Bridge over Arlington Boulevard at North Jackson Street: The renovation of this bridge includes the main bridge span as well as two ramps and a set of stairs.

  • Traffic Control Plan and Permit Application Preparation
  • Electrical Plan and Permit Application Preparation
  • Structural Design and Drawing Preparation
  • Shop Drawings, As-Builts, and Reports
  • Construction Management and Paint Testing

Page 3 of 7

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
© 2021 RAM Consulting Corporation